← Back to Work

Process Engineer

Teampool — Milk Production Facility

The Infrastructure

At the milk production facility, I specialized in the automation and control systems that keep the production lines running. My work revolved around the intersection of physical processes and digital control, managing a complex environment of PLC systems and SCADA interfaces.

Automation & Control

A major focus was PLC (Programmable Logic Controller) and SCADA programming, where I designed and optimized the logic that controls everything from tank temperatures to filling speeds. I also managed the virtual machine infrastructure that hosted our control systems, ensuring high availability and robust performance for 24/7 production cycles.

SCADA Infrastructure

Multi-Route Production Dashboard

PLC RUN
DATA BUS
PUMPIntakeSEPSeparatorPASTPasteurPROTEIN LINEFRESH MILKCHEESE LINEMIXProtein MixDRINKMILKVATCurdingCHEESEVM_CLUSTER_SCADA
AUTOMATION UNITS
MILK FLOW
PROTEIN DRINK
COTTAGE CHEESE